North Las Vegas, NV

Hey Dude

Distribution

ChopAir had the pleasure of working directly with NorthPoint Development and Clayco on the new 1m sqft HEYDUDE distribution center in North Las Vegas. ChopAir coordinated everything from the design, supply, and installation of HVLS fans. The selected equipment for the project was a total of [20] 24' Epic Colossus Industrial HVLS Fans, [1] iFan 7.0 Control Panel with BMS integration, and Networked Fire Control Panel.

August, 2023
Completed
1,043,620
Sqft
4,905,820
CFM

North Las Vegas, NV

Hey Dude

Distribution

ChopAir had the pleasure of working directly with NorthPoint Development and Clayco on the new 1m sqft HEYDUDE distribution center in North Las Vegas. ChopAir coordinated everything from the design, supply, and installation of HVLS fans. The selected equipment for the project was a total of [20] 24' Epic Colossus Industrial HVLS Fans, [1] iFan 7.0 Control Panel with BMS integration, and Networked Fire Control Panel.

August, 2023
Completed
1,043,620
Sqft
4,905,820
CFM

Get a Quote

Adding new fans? Planning new construction?
Contact us today for a free site visit.